Imágenes de páginas
PDF
EPUB

necessary waste water collection and urban storm water runoff systems; and a program to provide the necessary financial arrangements for the development of such treatment works;

(B) the establishment of construction priorities for such treatment works and time schedules for the initiation and completion of all treatment works;

(C) the establishment of a regulatory program to

(i) implement the waste treatment management requirements of section 1281(c) of this title,

(ii) regulate the location, modification, and construction of any facilities within such area which may result in any discharge in such area, and

(iii) assure that any industrial or commercial wastes discharged into any treatment works in such area meet applicable pretreatment requirements;

(D) the identification of those agencies necessary to construct, operate, and maintain all facilities required by the plan and otherwise to carry out the plan;

(E) the identification of the measures necessary to carry out the plan (including financing), the period of time necessary to carry out the plan, the costs of carrying out the plan within such time, and the economic, social, and environmental impact of carrying out the plan within such time;

(F) a process to (i) identify, if appropriate, agriculturally and silviculturally related nonpoint sources of pollution, including runoff from manure disposal areas, and from land used for livestock and crop production, and (ii) set forth procedures and methods (including land use requirements) to control to the extent feasible such sources;

(G) a process to (i) identify, if appropriate, mine-related sources of pollution including new, current, and abandoned surface and underground mine runoff, and (ii) set forth procedures and methods (including land use requirements) to control to the extent feasible such sources;

(H) a process to (i) identify construction activity related sources of pollution, and (ii) set forth procedures and methods (including land use requirements) to control to the extent feasible such sources;

(I) a process to (i) identify, if appropriate, salt water intrusion into rivers, lakes, and estuaries resulting from reduction of fresh water flow from any cause, including irrigation, obstruction, ground water extraction, and diversion, and (ii) set forth procedures and methods to control such intrusion to the extent feasible where such procedures and methods are otherwise a part of the waste treatment management plan;

(J) a process to control the disposition of all residual waste generated in such area which could affect water quality; and

(K) a process to control the disposal of pollutants on land or in subsurface excavations within such area to protect ground and surface water quality.

(3) Areawide waste treatment management plans shall be certified annually by the Governor or his designee (or Governors or their designees, where more than one State is involved) as being consistent with applicable basin plans and such areawide waste treatment management plans shall be submitted to the Administrator for his approval.

(4) Whenever the Governor of any State determines (and notifies the Administrator) that consistency with a statewide regulatory program under section 1313 of this title so requires, the requirements of clauses (F) through (K) of paragraph (2) of this subsection shall be developed and submitted by the Governor to the Administrator for application to all regions within such State.

(c) Regional operating agencies.

(1) The Governor of each State, in consultation with the planning agency designated under subsection (a) of this section, at the time a plan is submitted to the Administrator, shall designate one or more waste treatment management agencies (which may be an existing or newly created local, regional, or State agency or political subdivision) for each area designated under subsection (a) of this section and submit such designations to the Administrator. (2) The Administrator shall accept any such designation, unless, within 120 days of such designation, he finds that the designated management agency (or agencies) does not have adequate authority

(A) to carry out appropriate portions of an areawide waste treatment management plan developed under subsection (b) of this section;

(B) to manage effectively waste treatment works and related facilities serving such area in conformance with any plan required by subsection (b) of this section;

(C) directly or by contract, to design and construct new works, and to operate and maintain new and existing works as required by any plan developed pursuant to subsection (b) of this section;

(D) to accept and utilize grants, or other funds from any source, for waste treatment management purposes;

(E) to raise revenues, including the assessment of waste treatment charges;

(F) to incur short- and long-term indebtedness;

(G) to assure in implementation of an area wide waste treatment management plan that each participating community pays its proportionate share of treatment costs;

(H) to refuse to receive any wastes from any municipality or subdivision thereof, which does not comply with any provisions of an approved plan under this section applicable to such area; and

(I) to accept for treatment industrial wastes. (d) Conformity of works with area plan.

After a waste treatment management agency having the authority required by subsection (c) of this section has been designated under such subsection for an area and a plan for such area has been approved under subsection (b) of this section, the Administrator shall not make any grant for construction of a publicly owned treatment works under

section 1281(g) (1) of this title within such area except to such designated agency and for works in conformity with such plan.

(e) Permits not to conflict with approved plans.

No permit under section 1342 of this title shall be issued for any point source which is in conflict with a plan approved pursuant to subsection (b) of this section.

(f) Grants.

(1) The Administrator shall make grants to any agency designated under subsection (a) of this section for payment of the reasonable costs of developing and operating a continuing areawide waste treatment management planning process under subsection (b) of this section.

(2) The amount granted to any agency under paragraph (1) of this subsection shall be 100 per centum of the costs of developing and operating a continuing areawide waste treatment management planning process under subsection (b) of this section for each of the fiscal years ending on June 30, 1973, June 30, 1974, and June 30, 1975, and shall not exceed 75 per centum of such costs in each succeeding fiscal year.

(3) Each applicant for a grant under this subsection shall submit to the Administrator for his approval each proposal for which a grant is applied for under this subsection. The Administrator shall act upon such proposal as soon as practicable after it has been submitted, and his approval of that proposal shall be deemed a contractual obligation of the United States for the payment of its contribution to such proposal. There is authorized to be appropriated to carry out this subsection not to exceed $50,000,000 for the fiscal year ending June 30, 1973, not to exceed $100,000,000 for the fiscal year ending June 30, 1974, and not to exceed $150,000,000 for the fiscal year ending June 30, 1975.

(g) Technical assistance by Administrator.

The Administrator is authorized, upon request of the Governor or the designated planning agency, and without reimbursement, to consult with, and provide technical assistance to, any agency designated under subsection (a) of this section in the development of areawide waste treatment management plans under subsection (b) of this section. (h) Technical assistance by Secretary of the Army.

(1) The Secretary of the Army, acting through the Chief of Engineers, in cooperation with the Administrator is authorized and directed, upon request of the Governor or the designated planning organization, to consult with, and provide technical assistance to, any agency designed' under subsection (a) of this section in developing and operating a continuing area wide waste treatment management planning process under subsection (b) of this section.

(2) There is authorized to be appropriated to the Secretary of the Army, to carry out this subsection, not to exceed $50,000,000 per fiscal year for the fiscal years ending June 30, 1973, and June 30, 1974. (June

1 So in original probably should be "designated".

30, 1948, ch. 758, title II, § 208, as added Oct. 18, 1972, Pub. L. 92-500, § 2, 86 Stat. 839.)

SECTION REFERRED TO IN OTHER SECTIONS This section is referred to in sections 1252, 1284, 1287, 1289, 1313, 1314, 1362, 1375, 1376 of this title.

§ 1289. Basin planning.

(a) The President, acting through the Water Resources Council, shall, as soon as practicable, prepare a Level B plan under the Water Resources Planning Act for all basins in the United States. All such plans shall be completed not later than January 1, 1980, except that priority in the preparation of such plans shall be given to those basins and portions thereof which are within those areas designated under paragraphs (2), (3), and (4) of subsection (a) of section 1288 of this title.

(b) The President, acting through the Water Resources Council, shall report annually to Congress on progress being made in carrying out this section. The first such report shall be submitted not later than January 31, 1973.

(c) There is authorized to be appropriated to carry out this section not to exceed $200,000,000. (June 30, 1948, ch. 758, title II, § 209, as added Oct. 18, 1972, Pub. L. 92-500, § 2, 86 Stat. 843.)

REFERENCES IN TEXT

The Water Resources Planning Act referred to in text, is classified to section 1962 et seq. of Title 42, The Public Health and Welfare.

SECTION REFERRED TO IN OTHER SECTIONS This section is referred to in sections 1287, 1313, 1375, 1376 of this title.

§ 1290. Annual survey.

The Administrator shall annually make a survey to determine the efficiency of the operation and maintenance of treatment works constructed with grants made under this chapter, as compared to the efficiency planned at the time the grant was made. The results of such annual survey shall be included in the report required under section 1375 (a) of this title. (June 30, 1948, ch. 758, title II, § 210, as added Oct. 18, 1972, Pub. L. 92-500, § 2, 86 Stat. 843.)

SECTION REFERRED TO IN OTHER SECTIONS

This section is referred to in section 1375 of this title.

§ 1291. Sewage collection systems.

No grant shall be made for a sewage collection system under this subchapter unless such grant (1) is for replacement or major rehabilitation of an existing collection system and is necessary to the total integrity and performance of the waste treatment works servicing such community, or (2) is for a new collection system in an existing community with sufficient existing or planned capacity adequately to treat such collected sewage and is consistent with section 1281 of this title. (June 30, 1948, ch. 758, title II, § 211, as added Oct. 18, 1972, Pub. L. 92-500, § 2, 86 Stat. 843.)

§ 1292. Definitions.

As used in this subchapter

(1) The term "construction" means any one or more of the following: preliminary planning to determine the feasibility of treatment works, engineering, architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working

drawings, specifications, procedures, or other necessary actions, erection, building, acquisition, alteration, remodeling, improvement, or extension of treatment works, or the inspection or supervision of any of the foregoing items.

(2) (A) The term "treatment works" means any devices and systems used in the storage, treatment, recycling, and reclamation of municipal sewage or industrial wastes of a liquid nature to implement section 1281 of this title, or necessary to recycle or reuse water at the most economical cost over the estimated life of the works, including intercepting sewers, outfall sewers, sewage collection systems, pumping, power, and other equipment, and their appurtenances; extensions, improvements, remodeling, additions, and alterations thereof; elements essential to provide a reliable recycled supply such as standby treatment units and clear well facilities; and any works, including site acquisition of the land that will be an integral part of the treatment process or is used for ultimate disposal of residues resulting from such treatment.

(B) In addition to the definition contained in subparagraph (A) of this paragraph, "treatment works" means any other method or system for preventing, abating, reducing, storing, treating, separating, or disposing of municipal waste, including storm water runoff, or industrial waste, including waste in combined storm water and sanitary sewer systems. Any application for construction grants which includes wholly or in part such methods or systems shall, in accordance with guidelines published by the Administrator pursuant to subparagraph (C) of this paragraph, contain adequate data and analysis demonstrating such proposal to be, over the life of such works, the most cost efficient alternative to comply with sections 1311 or 1312 of this title, or the requirements of section 1281 of this title.

(C) For the purposes of subparagraph (B) of this paragraph, the Administrator shall, within one hundred and eighty days after October 18, 1972, publish and thereafter revise no less often than annually, guidelines for the evaluation of methods, including cost-effective analysis, described in subparagraph (B) of this paragraph.

(3) The term "replacement" as used in this subchapter means those expenditures for obtaining and installing equipment, accessories, or appurtenances during the useful life of the treatment works necessary to maintain the capacity and performance for which such works are designed and constructed. (June 30, 1948, ch. 758, title II, § 212, as added Oct. 18, 1972, Pub. L. 92-500, § 2, 86 Stat. 844.)

SECTION REFERRED TO IN OTHER SECTIONS

This section is referred to in sections 1317, 1342, 1345, 1375 of this title.

SUBCHAPTER III-STANDARDS AND

ENFORCEMENT

§ 1311. Effluent limitations.

(a) Illegality of pollutant discharges except in compliance with law.

Except as in compliance with this section and sections 1312, 1316, 1317, 1328, 1342, and 1344 of this

title, the discharge of any pollutant by any person shall be unlawful.

(b) Timetable for achievement of objectives.

In order to carry out the objective of this chapter there shall be achieved

(1) (A) not later than July 1, 1977, effluent limitations for point sources, other than publicly owned treatment works, (i) which shall require the application of the best practicable control technology currently available as defined by the Administrator pursuant to section 1314(b) of this title, or (ii) in the case of a discharge into a publicly owned treatment works which meets the requirements of subparagraph (B) of this paragraph, which shall require compliance with any applicable pretreatment requirements and any requirements under section 1317 of this title; and (B) for publicly owned treatment works in existence on July 1, 1977, or approved pursuant to section 1283 of this title prior to June 30, 1974 (for which construction must be completed within four years of approval), effluent limitations based upon secondary treatment as defined by the Administrator pursuant to section 1314(d) (1) of this title; or,

(C) not later than July 1, 1977, any more stringent limitation, including those necessary to meet water quality standards, treatment standards, or schedules of compliance, established pursuant to any State law or regulations (under authority preserved by section 1370 of this title) or any other Federal law or regulation, or required to implement any applicable water quality standard established pursuant to this chapter.

(2) (A) not later than July 1, 1983, effluent limitations for categories and classes of point sources. other than publicly owned treament works, which (i) shall require application of the best available technology economically achievable for such category or class, which will result in reasonable further progress toward the national goal of eliminating the discharge of all pollutants, as determined in accordance with regulations issued by the Administrator pursuant to section 1314(b) (2) of this title, which such effluent limitations shall require the elimination of discharges of all pollutants if the Administrator finds, on the basis of information available to him (including information developed pursuant to section 1325 of this title), that such elimination is technologically and economically achievable for a category or class of point sources as determined in accordance with regulations issued by the Administrator pursuant to section 1314(b) (2) of this title, or (ii) in the case of the introduction of a pollutant into a publicly owned treatment works which meets the requirements of subparagraph (B) of this paragraph, shall require compliance with any applicable pretreatment requirements and any other requirement under section 1317 of this title; and

(B) not later than July 1, 1983, compliance by all publicly owned treatment works with the requirements set forth in section 1281(g) (2) (A) of this title.

(c) Modification of timetable.

The Administrator may modify the requirements of subsection (b) (2) (A) of this section with respect to any point source for which a permit application is filled after July 1, 1977, upon a showing by the owner or operator of such point source satisfactory to the Administrator that such modified requirements (1) will represent the maximum use of technology within the economic capability of the owner or operator; and (2) will result in reasonable further progress toward the elimination of the discharge of pollutants.

(d) Review and revision of effluent limitations.

Any effluent limitation required by paragraph (2) of subsection (b) of this section shall be reviewed at least every five years and, if appropriate, revised pursuant to the procedure established under such paragraph.

(e) All point discharge source application of effluent limitations.

Effluent limitations established pursuant to this section or section 1312 of this title shall be applied to all point sources of discharge of pollutants in accordance with the provisions of this chapter.

(f) Illegality of discharge of radiological, chemical, or biological warfare agents or high-level radioactive waste.

Notwithstanding any other provisions of this chapter it shall be unlawful to discharge any radiological, chemical, or biological warfare agent or high-level radioactive waste into the navigable waters. (June 30, 1948, ch. 758, title III, § 301, as added Oct. 18, 1972, Pub. L. 92-500, § 2, 86 Stat. 844.)

SECTION REFERRED TO IN OTHER SECTIONS

This section is referred to in sections 1255, 1292, 1312, 1313, 1314, 1319, 1325, 1326, 1341, 1342, 1365, 1367, 1369 of this title.

§ 1312. Water quality related effluent limitations.

(a) Whenever, in the judgment of the Administrator, discharges of pollutants from a point source or group of point sources, with the application of effluent limitations required under section 1311(b) (2) of this title, would interfere with the attainment or maintenance of that water quality in a specific portion of the navigable waters which shall assure protection of public water supplies, agricultural and industrial uses, and the protection and propagation of a balanced population of shellfish, fish and wildlife, and allow recreational activities in and on the water, effluent limitations (including alternative effluent control strategies) for such point source or sources shall be established which can reasonably be expected to contribute to the attainment or maintenance of such water quality.

(b) (1) Prior to establishment of any effluent limitation pursuant to subsection (a) of this section, the Administrator shall issue notice of intent to establish such limitation and within ninety days of such notice hold a public hearing to determine the relationship of the economic and social costs of achieving any such limitation or limitations, including any economic or social dislocation in the affected community or communities, to the social and economic benefits to be obtained (including the attainment of the objective of this chapter) and to deter

mine whether or not such effluent limitations can be implemented with available technology or other alternative control strategies.

(2) If a person affected by such limitation demonstrates at such hearing that (whether or not such technology or other alternative control strategies are available) there is no reasonable relationship between the economic and social costs and the benefits to be obtained (including attainment of the objective of this chapter), such limitation shall not become effective and the Administrator shall adjust such limitation as it applies to such person.

(c) The establishment of effluent limitations under this section shall not operate to delay the application of any effluent limitation established under section 1311 of this title. (June 30, 1948, ch. 758, title III, § 302, as added Oct. 18, 1972, Pub. L. 92-500, § 2, 86 Stat. 846.)

SECTION REFERRED TO IN OTHER SECTIONS

This section is referred to in sections 1292, 1311, 1313, 1319, 1341, 1342, 1365, 1367, 1369 of this title.

§ 1313. Water quality standards and implementation plans.

(a) Existing water quality standards.

(1) In order to carry out the purpose of this chapter, any water quality standard applicable to interstate waters which was adopted by any State and submitted to, and approved by, or is a waiting approval by, the Administrator pursuant to this Act as in effect immediately prior to the date of enactment of the Federal Water Pollution Control Act Amendments of 1972, shall remain in effect unless the Administrator determined that such standard is not consistent with the applicable requirements of this Act as in effect immediately prior to the date of enactment of the Federal Water Pollution Control Act Amendments of 1972. If the Administrator makes such a determination he shall, within three months after October 18, 1972, notify the State and specify the changes needed to meet such requirements. If such changes are not adopted by the State within ninety days after the date of such notification, the Administrator shall promulgate such changes in accordance with subsection (b) of this section.

(2) Any State which, before October 18, 1972, has adopted, pursuant to its own law, water quality standards applicable to intrastate waters shall submit such standards to the Administrator within thirty days after October 18, 1972. Each such standard shall remain in effect, in the same manner and to the same extent as any other water quality standard established under this chapter unless the Administrator determines that such standard is inconsistent with the applicable requirements of this Act as in effect immediately prior to the date of enactment of the Federal Water Pollution Control Act Amendments of 1972. If the Administrator makes such a determination he shall not later than the one hundred and twentieth day after the date of submission of such standards, notify the State and specify the changes needed to meet such requirements. If such changes are not adopted by the State within ninety days after such notification, the Administrator shall promulgate such changes in accordance with subsection (b) of this section.

(3) (A) Any State which prior to October 18, 1972, has not adopted pursuant to its own laws water quality standards applicable to intrastate waters shall, not later than one hundred and eighty days after October 18, 1972, adopt and submit such standards to the Administrator.

(B) If the Administrator determines that any such standards are consistent with the applicable requirements of this Act as in effect immediately prior to the date of enactment of the Federal Water Pollution Control Act Amendments of 1972, he shall approve such standards.

(C) If the Administrator determines that any such standards are not consistent with the applicable requirements of this Act as in effect immediately prior to the date of enactment of the Federal Water Pollution Control Act Amendments of 1972, he shall, not later than the ninetieth day after the date of submission of such standards, notify the State and specify the changes to meet such requirements. If such changes are not adopted by the State within ninety days after the date of notification, the Administrator shall promulgate such standards pursuant to subsection (b) of this section.

(b) Proposed regulations.

(1) The Administrator shall promptly prepare and publish proposed regulations setting forth water quality standards for a State in accordance with the applicable requirements of this Act as in effect immediately prior to the date of enactment of the Federal Water Pollution Control Act Amendments of 1972, if—

(A) the State fails to submit water quality standards within the times prescribed in subsection (a) of this section.

(B) a water quality standard submitted by such State under subsection (a) of this section is determined by the Administrator not to be consistent with the applicable requirements of subsection (a) of this section.

(2) The Administrator shall promulgate any water quality standard published in a proposed regulation not later than one hundred and ninety days after the date he publishes any such proposed standard, unless prior to such promulgation, such State has adopted a water quality standard which the Administrator determines to be in accordance with subsection (a) of this section.

(c) Review; revised standards; publication.

(1) The Governor of a State or the State water pollution control agency of such State shall from time to time (but at least once each three year period beginning with October 18, 1972) hold public hearings for the purpose of reviewing applicable water quality standards and, as appropriate, modifying and adopting standards. Results of such review shall be made available to the Administrator.

(2) Whenever the State revises or adopts a new standard, such revised or new standard shall be submitted to the Administrator. Such revised or new water quality standard shall consist of the designated uses of the navigable waters involved and the water quality criteria for such waters based upon such uses. Such standards shall be such as to protect the public health or welfare, enhance the quality of

water and serve the purposes of this chapter. Such standards shall be established taking into consideration their use and value for public water supplies, propagation of fish and wildlife, recreational purposes, and agricultural, industrial, and other purposes, and also taking into consideration their use and value for navigation.

(3) If the Administrator, within sixty days after the date of submission of the revised or new standard, determines that such standard meets the requirements of this chapter, such standard shall thereafter be the water quality standard for the applicable waters of that State. If the Administrator determines that any such revised or new standard is not consistent with the applicable requirements of this chapter, he shall not later than the ninetieth day after the date of submission of such standard notify the State and specify the changes to meet such requirements. If such changes are not adopted by the State within ninety days after the date of notification, the Administrator shall promulgate such standard pursuant to paragraph (4) of this subsection.

(4) The Administrator shall promptly prepare and publish proposed regulations setting forth a revised or new water quality standard for the navigable waters involved

(A) if a revised or new water quality standard submitted by such State under paragraph (3) of this subsection for such waters is determined by the Administrator not to be consistent with the applicable requirements of this chapter, or

(B) in any case where the Administrator determines that a revised or new standard is necessary to meet the requirements of this chapter. The Administrator shall promulgate any revised or new standard under this paragraph not later than ninety days after he publishes such proposed standards, unless prior to such promulgation, such State has adopted a revised or new water quality standard which the Administrator determines to be in accordance with this chapter.

(d) Identification of areas with insufficient controls; maximum daily load.

(1) (A) Each State shall identify those waters within its boundaries for which the effluent limitations required by section 1311(b) (1) (A) and section 1311(b) (1) (B) of this title are not stringent enough to implement any water quality standard applicable to such waters. The State shall establish a priority ranking for such waters, taking into account the severity of the pollution and the uses to be made of such waters.

(B) Each State shall identify those waters or parts thereof within its boundaries for which controls on thermal discharges under section 1311 of this title are not stringent enough to assure protection and propagation of a balanced indigenous population of shellfish, fish, and wildlife.

(C) Each State shall establish for the waters identified in paragraph (1)(A) of this subsection, and in accordance with the priority ranking, the total maximum daily load, for those pollutants which the Administrator identifies under section 1314(a) (2) of this title as suitable for such calculation. Such load shall be established at a level necessary to implement the applicable water quality standards with

« AnteriorContinuar »