Imágenes de páginas
PDF
EPUB

conditions of interest to persons who may be interested in the recreational aspects of the project or who may wish to acquire lands in its vicinity. Such efforts shall include but not be limited to: the publication of notice in a local newspaper once each week for 4 weeks of the project's license conditions which relate to public access to and the use of the project waters and lands for recreational purposes, recreational plans, installation of recreation and fish and wildlife facilities, reservoir water surface elevations, minimum water releases or rates of change of water releases and such other conditions of general public interest as the Commission may designate in the order issuing or amending the license.

[Order 299, 30 FR 7313, June 3, 1965]

§ 8.2 Posting of project lands as to recreational use and availability of information.

(a) Following the issuance or amendment of a license, the licensee shall post and shall maintain at all points of public access which are required by the license (or at such access points as are specifically designated for this purpose by the licensee) and at such other points as are subsequently prescribed by the Commission on its own motion or upon the recommendation of a public recreation agency operating in the area in which the project is located, a conspicuous sign giving the name of the project and the owner of the project, a statement that it is licensed by the Commission and the project number, directions to the areas of the project which are available for public recreation use, permissible times and activities, and other regulations regarding such use, and advising that further information may be obtained at local offices of the licensee in the vicinity of the project. In addition, the licensee shall post at such locations conspicuous notice that the recreation facilities are open to all members of the public without discrimination.

(b) The licensee shall make available for inspection at its local offices in the vicinity of the project the recreation plan approved by the Commission and the entire license instrument, properly indexed for easy reference to the li

cense conditions designated for publications in §8.1.

[Order 299, 30 FR 7313, June 3, 1965, as amended by Order 341, 32 FR 6488, Apr. 27, 1967; 32 FR 11640, Aug. 11, 1967]

§ 8.3 Discrimination prohibited.

Every licensee maintaining recreation facilities for the use of the public at a licensed project, or employing or permitting any other person to maintain such facilities, shall permit, or require such other person to permit, equal and unobstructed use of such facilities to all members of the public without regard to race, color, religious creed or national origin.

[Order 341, 32 FR 6488, Apr. 27, 1967]

§8.11 Information respecting use and development of public recreational opportunities.

(a) Applicability. (1) Except as provided in paragraph (b) of this section, each licensee of a project under major or minor Commission license shall prepare with respect to each development within such project an original and two conformed copies of FERC Form No. 80 prescribed by §141.14 of this chapter and submit them to a Commission Regional Office pursuant to the requirements in the General Information portion of the form.

(2) FERC Form No. 80 is due on April 1, 1991, for data compiled during the calendar year ending December 31, 1990. Thereafter, FERC Form No. 80 is due on April 1 of every sixth year for data compiled during the previous calendar year.

(3) The Form No. 80 shall be completed in its entirety for each initial filing of the report. Filings of Form No. 80 made subsequent to an initial filing of the report shall be completed only to the extent necessary to change, delete or add to the information supplied in a previously-filed form.

(4) A copy of the Form No. 80 should be retained by the respondent licensee in its file.

(b) Initial Form No. 80 filings. Each licensee of an unconstructed project shall file an initial Form No. 80 after such project has been in operation for a full calendar year prior to the filing deadline. Each licensee of an existing

(constructed) project shall file an initial Form No. 80 after such project has been licensed for a full calendar year prior to the filing deadline.

(c) Exemptions. A licensee who has filed a Form No. 80 may request an exemption from any further filing of the form for any development that has no existing or potential recreational use or only a minor existing or potential recreational use (as indicated by fewer than 100 recreation days of use during the previous calendar year) by submitting a statement not later than 6 months prior to the due date for the next filing, stating that Form No. 80 has been filed previously for such development and setting out the basis for believing that the development has no existing or potential recreational use or a minor existing or potential recreational use.

(Approved by the Office of Management and Budget under control number 1902-0106)

[blocks in formation]

plication shall be verified, shall conform to §131.20 of this chapter, and shall be filed in accordance with §4.31 of this chapter.

[Order 501, 39 FR 2267, Jan. 18, 1974]

§ 9.2 Contents of application.

Every application for approval of such transfer and acquisition by the proposed transferee shall set forth in appropriate detail the qualifications of the transferee to hold such license and to operate the property under license, which qualifications shall be the same as those required of applicants for li

cense.

[Order 141, 12 FR 8491, Dec. 19, 1947]

CROSS REFERENCES: For administrative rules relating to applicants for license, see part 385 of this chapter. For regulations as to licenses and permits, see part 4 of this chapter.

$9.3 Transfer.

(a) Approval by the Commission of transfer of a license is contingent upon the transfer of title to the properties under license, delivery of all license instruments, and a showing that such transfer is in the public interest. The transferee shall be subject to all the conditions of the license and to all the provisions and conditions of the act, as though such transferee were the original licensee and shall be responsible for the payment of annual charges which accrue prior to the date of transfer.

(b) When the Commission shall have approved the transfer of the license, its order of approval shall be forwarded to the transferee for acknowledgment of acceptance. Unless application for rehearing is filed, or unless the order is stayed by the Commission, the order shall become final thirty (30) days from date of issuance and the acknowledgment of acceptance shall be filed in triplicate with the Commission within sixty (60) days from date of issuance accompanied by a certified copy of the deed of conveyance or other instrument evidencing transfer of the property under license, together with evidence of the recording thereof.

[Order 175, 19 FR 5217, Aug. 18, 1954]

[blocks in formation]

Any licensee desiring to lease the project property covered by a license or any part thereof, whereby the lessee is granted the exclusive occupancy, possession, or use of project works for purposes of generating, transmitting, or distributing power, and the person, association, or corporation, State, or municipality desiring to acquire such project property by lease, shall file as many copies of such proposed lease together with as many copies of the application as required in accordance with §4.31 of this chapter. Such application and action thereon by the Commission will, in general, be subject to the provisions of §§9.1 through 9.3. [Order 501, 39 FR 2267, Jan. 18, 1974]

[blocks in formation]
[blocks in formation]

§ 11.1 Costs of administration.

(a) Authority. Pursuant to section 10(e) of the Federal Power Act and section 3401 of the Omnibus Budget Reconciliation Act of 1986, the Commission will assess reasonable annual charges against licensees and exemptees to reimburse the United States for the costs of administration of the Commission's hydropower regulatory program.

(b) Scope. The annual charges under this section will be charged to and allocated among:

(1) All licensees of projects of more than 1.5 megawatts of installed capacity; and

(2) All holders of exemptions under either section 30 of the Federal Power Act or sections 405 and 408 of the Public Utility Regulatory Policies Act of 1978, as amended by section 408 of the Energy Security Act of 1980, but only if the exemption was issued subsequent to April 21, 1995 and is for a project of more than 1.5 megawatts of installed capacity.

(3) If the exemption for a project of more than 1.5 megawatts of installed capacity was issued subsequent to April 21, 1995 but pursuant to an application filed prior to that date, the exemptee may credit against its annual charge any filing fee paid pursuant to § 381.601 of this chapter, which was removed effective April 21, 1995, 18 CFR 381.601 (1994), until the total of all such credits equals the filing fee that was paid.

(c) Licenses and exemptions other than State or municipal. For licensees and exemptees, other than State or municipal:

(1) A determination shall be made for each fiscal year of the costs of administration of Part I of the Federal Power Act chargeable to such licensees or exemptees, from which shall be deducted any administrative costs that are stated in the license or exemption or fixed by the Commission in determining headwater benefit payments.

or

(2) For each fiscal year the costs of administration determined under paragraph (c)(1) of this section will be assessed against such licenses exemptee in the proportion that the annual charge factor for each such project bears to the total of the annual charge factors under all such outstanding licenses and exemptions.

(3) The annual charge factor for each such project shall be found as follows:

(1) For a conventional project the factor is its authorized installed capacity plus 112.5 times its annual energy output in millions of kilowatt-hours.

(ii) For a pure pumped storage project the factor is its authorized installed capacity.

(iii) For a mixed conventionalpumped storage project the factor is its authorized installed capacity plus 112.5 times its gross annual energy output in millions of kilowatt-hours less 75 times the annual energy used for pumped storage pumping in million of kilowatt-hours.

(iv) For purposes of determining their annual charges factor, projects that are operated pursuant to an exemption will be deemed to have an annual energy output of zero.

(4) To enable the Commission to determine such charges annually, each licensee whose authorized installed capacity exceeds 1.5 megawatts must file with the Commission, on or before November 1 of each year, a statement under oath showing the gross amount of power generated (or produced by nonelectrical equipment) and the amount of power used for pumped storage pumping by the project during the preceding fiscal year, expressed in kilowatt hours. If any licensee does not report the gross energy output of its project within the time specified above, the Commission's staff will estimate the energy output and this estimate may be used in lieu of the filings

required by this section made by such licensee after November 1.

(5) For unconstructed projects, the assessments start on the date of commencement of project construction. For constructed projects, the assessments start on the effective date of the license or exemption, except for any new capacity authorized therein. The assessments for new authorized capacity start on the date of commencement of construction of such new capacity. In the event that construction commences during a fiscal year, the charges will be prorated based on the date on which construction commenced.

(d) State and municipal licensees and exemptees. For State or municipal licensees and exemptees:

(1) A determination shall be made for each fiscal year of the cost of administration under Part I of the Federal Power Act chargeable to such licensees and exemptees, from which shall be deducted any administrative costs that are stated in the license or exemption or that are fixed by the Commission in determining headwater benefit payments.

(2) An exemption will be granted to a licensee or exemptee to the extent, if any, to which it may be entitled under section 10(e) of the Act provided the data is submitted as requested in paragraphs (d) (4) and (5) of this section.

(3) For each fiscal year the total actual cost of administration as determined under paragraph (d)(1) of this section will be assessed against each such licensee or exemptee (except to the extent of the exemptions granted pursuant to paragraph (d)(2) of this section) in the proportion that the authorized installed capacity of each such project bears to the total such capacity under all such outstanding licenses or exemptions.

(4) To enable the Commission to compute on the bill for annual charges the exemption to which State and municipal licensees and exemptees are entitled because of the use of power by the licensee or exemptee for State or municipal purposes, each such licensee or exemptee must file with the Commission, on or before November 1 of each year, a statement under oath showing the following information with respect

to the power generated by the project and the disposition thereof during the preceding fiscal year, expressed in kilowatt-hours:

(i) Gross amount of power generated by the project.

(ii) Amount of power used for station purposes and lost in transmission, etc. (iii) Net amount of power available for sale or use by licensee or exemptee, classified as follows:

(A) Used by licensee or exemptee. (B) Sold by licensee or exemptee.

(5) When the power from a licensed or exempted project owned by a State or municipality enters into its electric system, making it impracticable to meet the requirements of this section with respect to the disposition of project power, such licensee or exemptee may, in lieu thereof, furnish similar information with respect to the disposition of the available power of the entire electric system of the licensee or exemptee.

(6) The assessments commence on the date of commencement of project operation. In the event that project operation commences during a fiscal year, the charges will be prorated based on the date on which operation commenced.

(e) Transmission lines. For projects involving transmission lines only, the administrative charge will be stated in the license.

(f) Maximum charge. No licensed or exempted project's annual charge may exceed a maximum charge established each year by the Commission to equal 2.0 percent of the adjusted Commission costs of administration of the hydropower regulatory program. For every project with an annual charge determined to be above the maximum charge, that project's annual charge will be set at the maximum charge, and any amount above the maximum charge will be reapportioned to the remaining projects. The reapportionment will be computed using the method outlined in paragraphs (c) and (d) of this section (but excluding any project whose annual charge is already set at the maximum amount). This procedure will be repeated until no project's annual charge exceeds the maximum charge.

(g) Commission's costs. (1) With respect to costs incurred by the Commission, the assessment of annual charges will be based on an estimate of the costs of administration of Part I of the Federal Power Act that will be incurred during the fiscal year in which the annual charges are assessed. After the end of the fiscal year, the assessment will be recalculated based on the costs of administration that were actually incurred during that fiscal year; the actual costs will be compared to the estimated costs; and the difference between the actual and estimated costs will be carried over as an adjustment to the assessment for the subsequent fiscal year.

(2) The issuance of bills based on the administrative costs incurred by the Commission during the year in which the bill is issued will commence in 1993. The annual charge for the administrative costs that were incurred in fiscal year 1992 will be billed in 1994. At the licensee's option, the charge may be paid in three equal annual installments in fiscal years 1994, 1995, and 1996, plus any accrued interest. If the licensee elects the three-year installment plan, the Commission will accrue interest (at the most recent yield of two-year Treasury securities) on the unpaid charges and add the accrued interest to the installments billed in fiscal years 1995 and 1996.

(h) In making their annual reports to the Commission on their costs in administering Part I of the Federal Power Act, the United States Fish and Wildlife Service and the National Marine Fisheries Service are to deduct any amounts that were deposited into their Treasury accounts during that year as reimbursements for conducting studies and reviews pursuant to section 30(e) of the Federal Power Act.

(1) Definition. As used in paragraphs (c) and (d) of this section, authorized installed capacity means the lesser of the ratings of the generator or turbine units. The rating of a generator is the product of the continuous-load capacity rating of the generator in kilovoltamperes (kVA) and the system power factor in kW/kVA. If the licensee or exemptee does not know its power factor, a factor of 1.0 kW/kVA will be used. The rating of a turbine is the

« AnteriorContinuar »