[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small]

750 1000 1250 1500 1750 2000 2250 2500 2750 3000 3250 3500 3750

[merged small][ocr errors]
[blocks in formation]

Assumptions: Tanks 300' diameter x 40' high. Available volume inside diked area equal to volume of one tank. Minimum spacing 1/4 sum of diameters. Dikes have 3:1 slope with 10' roadway on top.

26-400 O 74 pt. 2 53

[blocks in formation]

Appendix 15-3

TERMINAL TANKAGE (M BBLS)

TERMINAL TANKAGE UTILIZATION BASED ON PROJECTED CARGO ADVANCE AND DELAY

[blocks in formation]
[blocks in formation]

TOTAL TERMINAL STORAGE AVAILABLE WORKING STORAGE

[blocks in formation]
[blocks in formation]

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 45 DAY PROJECTED SCHEDULE

CONTROLS AND STATUS INDICATIONS

The following data points are required for operation of the pipelines from marine berths to terminal and from terminal to St. James. Any branch pipelines or local pipelines would require similar data points from their operation. Additional data points will be required for marine operations at the offshore platform and at the ship berths.

[blocks in formation]

The following data points are required for marine operations at the offshore platform:

[blocks in formation]
[blocks in formation]

speed.

Analog record, normal, high exhaust.

Analog, position indication.

Start, stop...... Analog record, normal,

18. Platform emergency shutdown. Shutdown...

high fuel rate. Normal, incomplete.. Normal, unit lockout..... Normal, low lube

pressure, unit lockout. Normal, high lube temperature, unit shutdown.

Normal, high differential pressure, unit shutdown.

Normal, unit lockout.... Normal, low pressure,

unit shutdown.

Analog record, normal,

high pressure, low
pressure.
Analog record, normal,
high flow, low flow.
Analog record, normal,
low BTU.

Analog record, normal,
high temperature.
Analog record, normal,
high pressure, low
pressure.
Analog indication,

normal, high level.

Normal, shutdown start, shutdown complete.

Digital analog display, over speed, run. stop.

Normal, high exhaust.

Digital, position indication.

Digital analog display, normal, high fuel rate.

Normal, incomplete.
Normal, unit lockout.

Normal, low lube pressure, unit lockout.

Normal, high lube temperature, unit shutdown.

Normal, high differential pressure, unit shutdown.

Normal unit lockout.

Normal, low pressure, unit shutdown.

Digital analog indication, normal, high pressure, low pressure.

Digital analog indication, normal, high flow, low flow.

Digital analog indication, normal, high pressure, low pressure.

Normal, shutdown start, shutdown complete.

The following data points are required for operation of the tank farm at the terminal site: